Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,492

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0262 #04 Y:1999 Separate and recycle scrap metal to foundry or for sale $57,053 -
MO0262 #03 Y:1999 Contract a wood pallet recycling company $5,100 -
MO0262 #02 Y:1999 Reduce combustion air flow to optimum $417 $500
MO0262 #01 Y:1999 Install compressor air intakes in coolest locations $4,918 $100
KU0523 #06 Y:1999 Distill contaminated solvents for reuse $4,740 $6,300
KU0523 #05 Y:1999 Install compressor air intakes in coolest locations $740 $450
KU0523 #04 Y:1999 Use synthetic lubricant $800 $1,530
KU0523 #03 Y:1999 Eliminate or reduce compressed air usage $2,100 $560
KU0523 #02 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $4,040 $2,050
KU0523 #01 Y:1999 Optimize plant power factor $7,490 $7,600
DS0147 #07 Y:1999 Begin a practice of predictive / preventative maintenance $903 -
DS0147 #06 Y:1999 Use flow control valves on equipment to optimize water use $1,498 $2,832
DS0147 #05 Y:1999 Burn waste oil for heat $857 $1,695
DS0147 #04 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $1,400 $4,365
DS0147 #03 Y:1999 Recover waste heat from equipment $635 $1,156
DS0147 #02 Y:1999 Install compressor air intakes in coolest locations $301 $343
DS0147 #01 Y:1999 Install timers and/or thermostats $4,412 $3,358
AS0257 #07 Y:1999 Change rate schedules or other changes in utility service $149 $15
AS0257 #06 Y:1999 Install equipment to move product $203,979 $64,000
AS0257 #05 Y:1999 Pay bills on time to avoid late fees $728 $60