ITAC Assessment: AS0257
ITAC logo
ITAC Assessment: AS0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Concrete
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area 110,000
ft2
Annual Production 450,000
ton
Production Hrs. Annual 5,450
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,329 819,461
kWh
Electricity Demand $12,924 4,929
kW-mo/yr
Electricity Fees $4,916 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $206,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $405 $70 $405
5,569
kWh
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $461 $60 $399
5,569
kWh
$62
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $1,802 $2,140 $1,657
22,860
kWh
$145
-
kW-mo/yr
- - - -
04 2.4314: Use synthetic lubricant $148 $360 $34
586
kWh
$3
-
kW-mo/yr
$12
-
gal
- - $99
05 4.821: Pay bills on time to avoid late fees $728 $60 - - - - $728 -
06 4.445: Install equipment to move product $203,979 $64,000 $(-12,893.0)
(-177,315)
kWh
$(-1,128.0)
-
kW-mo/yr
- $218,000 - -
07 2.8114: Change rate schedules or other changes in utility service $149 $15 - - - - $149 -
TOTAL RECOMMENDED $207,672 $66,705 $(-10,398.0)
(-142,731)
kWh
$(-918.0)
-
kW-mo/yr
$12
-
gal
$218,000 $877 $99
TOTAL IMPLEMENTED $206,647 $66,270 $(-10,432.0)
(-143,317)
kWh
$(-921.0)
-
kW-mo/yr
- $218,000 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs