Assessment Year | 1998 |
---|---|
Principal Product | Truck Slides |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
100,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 2,346
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,868 | 1,706,331 |
kWh
|
$0.027 |
Electricity Demand | $112,372 | 7,004 |
kW-mo/yr
|
$16.04 |
Natural Gas | $60,023 | 13,774 |
MMBtu
|
$4.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,526 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,698 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $605 | $140 |
$158
5,862
kWh
|
$447
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,237 | $360 |
$1,235
45,721
kWh
|
$3,002
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $576 | $538 |
$143
5,275
kWh
|
$433
-
kW-mo/yr
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $4,280 | $240 |
$892
33,118
kWh
|
$3,388
-
kW-mo/yr
|
- | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $5,476 | $8,000 |
$(-170.0)
(-2,052)
kWh
|
- |
$7,605
-
lb
|
$(-1,959.0) | |
06 | 4.514: Re-arrange equipment layout to reduce handling costs | $5,836 | $500 | - | - | - | $5,836 | |
07 | 3.2176: Increase use of automation | $29,466 | $15,000 | - | - | - | $29,466 | |
08 | 3.2176: Increase use of automation | $76,050 | $215,000 | - | - | - | $76,050 | |
TOTAL RECOMMENDED | $126,526 | $239,778 |
$2,258
87,924
kWh
|
$7,270
-
kW-mo/yr
|
$7,605
-
lb
|
$109,393 | ||
TOTAL IMPLEMENTED | $9,698 | $1,278 |
$2,428
89,976
kWh
|
$7,270
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs