ITAC Assessment: GT0637
ITAC logo
ITAC Assessment: GT0637
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic Seals
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area 41,000
ft2
Annual Production 1,750,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,105 1,659,144
kWh
Electricity Demand $39,273 2,871
kW-mo/yr
Electricity Fees $2,156 -
Natural Gas $3,063 418
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $330,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $325,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,126 $3,000 $2,413
78,253
kWh
$1,555
-
kW-mo/yr
$158 - - -
02 3.5314: Use in-process recycling whenever possible $10,351 $1,450 $134
4,396
kWh
$217
-
kW-mo/yr
- - $10,000 -
03 2.7229: Air condition only space necessary $1,154 $2,610 $457
14,947
kWh
$653
-
kW-mo/yr
$44 - - -
04 4.321: Optimize production lot sizes and inventories $308,000 $20,000 - - - - $140,000 $168,000
05 2.4239: Eliminate or reduce compressed air usage $2,033 $3,000 $1,238
40,152
kWh
$795
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $450 $580
18,757
kWh
- - - - -
07 2.4133: Use most efficient type of electric motors $884 $7,620 $540
17,585
kWh
$344
-
kW-mo/yr
- - - -
08 3.5212: Regrind, reuse, or sell scrap plastic parts $3,560 - - - - $3,560
-
lb
- -
TOTAL RECOMMENDED $330,688 $38,130 $5,362
174,090
kWh
$3,564
-
kW-mo/yr
$202 $3,560
-
lb
$150,000 $168,000
TOTAL IMPLEMENTED $325,678 $27,510 $2,409
78,252
kWh
$1,665
-
kW-mo/yr
$44 $3,560
-
lb
$150,000 $168,000