Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Desiccants
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 147,000
ft2
Annual Production 810,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,871 5,519,176
kWh
Electricity Demand $54,076 1,054
kW-mo/yr
Electricity Fees $80,618 -
Natural Gas $203,653 32,319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7135: Install occupancy sensors $7,730 $35,830 $6,640
95,800
kWh
$1,090
-
kW-mo/yr
- - - - - -
02 2.7135: Install occupancy sensors $7,010 $1,600 $6,190
100,500
kWh
$820
-
kW-mo/yr
- - - - - -
03 2.2511: Insulate bare equipment $2,780 $1,760 $600
6,200
kWh
$80
-
kW-mo/yr
$2,100
-
MMBtu
- - - - -
04 2.2511: Insulate bare equipment $1,500 $630 - - $1,500
-
MMBtu
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,290 - $2,520
47,500
kWh
$720
-
kW-mo/yr
- - - $(-330.0) $(-1,620.0) -
06 2.1213: Direct warmest air to combustion intake $1,130 $2,170 - - $1,130
-
MMBtu
- - - - -
07 3.5217: Reuse / recycle/ sell paper products $15,440 - - - - $3,890
-
Tgal
- - - $11,550
08 3.8132: Use less toxic and volatile solvent substitutes $4,360 $4,000 $(-210.0)
(-5,300)
kWh
$(-90.0)
-
kW-mo/yr
- - $5,940
-
gal
- $(-1,280.0) -
TOTAL RECOMMENDED $41,240 $45,990 $15,740
244,700
kWh
$2,620
-
kW-mo/yr
$4,730
-
MMBtu
$3,890
-
Tgal
$5,940
-
gal
$(-330.0) $(-2,900.0) $11,550
TOTAL IMPLEMENTED $22,590 $4,630 $2,310
42,200
kWh
$630
-
kW-mo/yr
$1,500
-
MMBtu
$3,890
-
Tgal
$5,940
-
gal
$(-330.0) $(-2,900.0) $11,550
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs