Assessment Year | 1985 |
---|---|
Principal Product | DRUGS & PHARMACEUTICALS |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
n/a
|
Annual Production | 13,500,000
pieces
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,938 | 2,572,978 |
kWh
|
$0.086 |
Natural Gas | $39,825 | 5,602 |
MMBtu
|
$7.11 |
Fuel Oil #6 | $99,719 | 19,152 |
MMBtu
|
$5.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,682 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,569 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,995 | $1,070 |
$10,995
128,077
kWh
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $201 | $75 |
$201
2,345
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,132 | $116 |
$1,132
13,189
kWh
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,348 | $1,900 |
$8,348
-
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $610 | $1,500 | - | - |
$610
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,311 | $537 | - |
$2,311
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $428 | $110 | - |
$725
-
MMBtu
|
$(-297.0)
-
MMBtu
|
|
08 | 2.2414: Use waste heat from hot flue gases to preheat | $1,500 | $2,400 | - |
$1,500
-
MMBtu
|
- | |
09 | 2.7229: Air condition only space necessary | $537 | $300 | - | - |
$537
-
MMBtu
|
|
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,813 | $1,255 | - | - |
$2,813
-
MMBtu
|
|
11 | 2.7226: Use computer programs to optimize hvac performance | $20,807 | $12,000 |
$20,807
242,380
kWh
|
- | - | |
TOTAL RECOMMENDED | $49,682 | $21,263 |
$41,483
385,991
kWh
|
$4,536
-
MMBtu
|
$3,663
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,569 | $2,626 |
$12,328
143,611
kWh
|
$725
-
MMBtu
|
$2,516
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs