ITAC Assessment: DS0147
ITAC logo
ITAC Assessment: DS0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Valves and Regulators
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 41,000
ft2
Annual Production 26,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,992 2,419,695
kWh
Electricity Demand $38,094 5,688
kW-mo/yr
Electricity Fees $336 -
Natural Gas $6,289 1,254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $4,412 $3,358 $2,313
56,565
kWh
- $2,099
-
MMBtu
- - -
02 2.4221: Install compressor air intakes in coolest locations $301 $343 $205
4,982
kWh
$96
-
kW-mo/yr
- - - -
03 2.2437: Recover waste heat from equipment $635 $1,156 $635
28,722
kWh
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,400 $4,365 $1,266
30,774
kWh
$796
-
kW-mo/yr
$(-662.0)
-
MMBtu
- - -
05 3.6124: Burn waste oil for heat $857 $1,695 $174
10,258
kWh
- - - $683
-
gal
-
06 3.4156: Use flow control valves on equipment to optimize water use $1,498 $2,832 - - - $1,498
-
Tgal
- -
07 4.611: Begin a practice of predictive / preventative maintenance $903 - - - - - - $903
TOTAL RECOMMENDED $10,006 $13,749 $4,593
131,301
kWh
$892
-
kW-mo/yr
$1,437
-
MMBtu
$1,498
-
Tgal
$683
-
gal
$903
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs