Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,122

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0434 #02 Y:2011 Install occupancy sensors $7,897 $1,387
SD0434 #01 Y:2011 Reduce the pressure of compressed air to the minimum required $799 $100
MZ0063 #06 Y:2011 Maintain air filters by cleaning or replacement $1,235 $2,700
MZ0063 #05 Y:2011 Reduce the pressure of compressed air to the minimum required $3,660 $50
MZ0063 #04 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $3,168 $1,200
MZ0063 #03 Y:2011 Reschedule plant operations or reduce load to avoid peaks $886 $3,000
MZ0063 #02 Y:2011 Adjust vents to minimize energy use $1,007 $240
MZ0063 #01 Y:2011 Utilize higher efficiency lamps and/or ballasts $232 $480
MI0208 #07 Y:2011 Eliminate or reduce compressed air usage $1,789 $2,400
MI0208 #06 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $4,355 $1,320
MI0208 #05 Y:2011 Install vinyl strip / high speed / air curtain doors $11,241 $20,530
MI0208 #04 Y:2011 Lower temperature during the winter season and vice-versa $16,075 $2,550
MI0208 #03 Y:2011 Install partitions to reduce size of conditioned space $25,727 $48,170
MI0208 #02 Y:2011 Utilize higher efficiency lamps and/or ballasts $28,143 $16,918
MI0208 #01 Y:2011 Clean or color roof to reduce solar load $40,370 $292,600
MA0673 #08 Y:2011 Insulate bare equipment $386 $450
MA0673 #07 Y:2011 Install occupancy sensors $743 $1,800
MA0673 #06 Y:2011 Reduce the pressure of compressed air to the minimum required $1,078 $200
MA0673 #05 Y:2011 Use cooling tower or economizer to replace chiller cooling $1,432 $6,475
MA0673 #04 Y:2011 Eliminate or reduce compressed air usage $3,179 $8,435