ITAC Assessment: SD0434
ITAC logo
ITAC Assessment: SD0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Cream cheese
NAICS 445110: Supermarkets and Other Grocery (except Convenience) Stores
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 27,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 5,100
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,623 2,534,937
kWh
Electricity Demand $91,888 5,852
kW-mo/yr
Electricity Fees $4,971 -
Natural Gas $90,930 134,929
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,388 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $799 $100 $799
9,056
kWh
- -
02 2.7135: Install occupancy sensors $7,897 $1,387 $7,897
89,532
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $1,711 $500 $1,711
19,404
kWh
- -
04 2.2444: Use hot process fluids to preheat incoming process fluids $4,279 $4,751 - - $4,279
-
MMBtu
05 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,400 $2,063 - - $1,400
-
MMBtu
06 2.7145: Install skylights $11,302 $26,616 $8,712
98,774
kWh
$2,590
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,388 $35,417 $19,119
216,766
kWh
$2,590
-
kW-mo/yr
$5,679
-
MMBtu
TOTAL IMPLEMENTED $10,096 $3,550 $8,696
98,588
kWh
- $1,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs