Assessment Year | 2011 |
---|---|
Principal Product | Cream cheese |
NAICS | 445110: Supermarkets and Other Grocery (except Convenience) Stores |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
27,000
ft2
|
Annual Production | 30,000,000
units
|
Production Hrs. Annual | 5,100
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $223,623 | 2,534,937 |
kWh
|
$0.088 |
Electricity Demand | $91,888 | 5,852 |
kW-mo/yr
|
$15.70 |
Electricity Fees | $4,971 | - |
|
- |
Natural Gas | $90,930 | 134,929 |
MMBtu
|
$0.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,388 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,096 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $799 | $100 |
$799
9,056
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $7,897 | $1,387 |
$7,897
89,532
kWh
|
- | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $1,711 | $500 |
$1,711
19,404
kWh
|
- | - | |
04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $4,279 | $4,751 | - | - |
$4,279
-
MMBtu
|
|
05 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $1,400 | $2,063 | - | - |
$1,400
-
MMBtu
|
|
06 | 2.7145: Install skylights | $11,302 | $26,616 |
$8,712
98,774
kWh
|
$2,590
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $27,388 | $35,417 |
$19,119
216,766
kWh
|
$2,590
-
kW-mo/yr
|
$5,679
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,096 | $3,550 |
$8,696
98,588
kWh
|
- |
$1,400
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs