ITAC Assessment: LL0297
ITAC logo
ITAC Assessment: LL0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Paper mill rollers
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 37
Plant Area 43,000
ft2
Annual Production 520
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,188 2,330,720
kWh
Electricity Fees $6,847 -
Natural Gas $80,459 8,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,295 $660 $8,955
115,836
kWh
$340 -
02 2.4239: Eliminate or reduce compressed air usage $9,039 $4,182 $8,708
112,637
kWh
$331 -
03 2.2135: Repair and eliminate steam leaks $4,566 $730 - - $4,566
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,640 $7,300 $1,580
20,442
kWh
$60 -
05 2.7224: Reduce space conditioning during non-working hours $986 $264 $950
12,289
kWh
$36 -
06 2.2511: Insulate bare equipment $802 $930 - - $802
-
MMBtu
07 2.6211: Conserve energy by efficient use of vending machines $200 $312 $193
2,496
kWh
$7 -
TOTAL RECOMMENDED $26,528 $14,378 $20,386
263,700
kWh
$774 $5,368
-
MMBtu
TOTAL IMPLEMENTED $13,861 $1,390 $8,955
115,836
kWh
$340 $4,566
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs