Assessment Year | 2004 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS | 334412: Bare Printed Circuit Board Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $50 M to 100M |
# of Employees | 720 |
Plant Area |
275,000
ft2
|
Annual Production | 208,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,374,167 | 24,255,291 |
kWh
|
$0.057 |
Electricity Fees | $212,130 | - |
|
- |
Natural Gas | $212,130 | 32,236 |
MMBtu
|
$6.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $212,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $87,632 | $105,000 |
$74,790
1,350,000
kWh
|
$12,842
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $62,038 | $22,800 |
$46,395
1,220,132
kWh
|
$15,643
-
kW-mo/yr
|
- | |
03 | 2.2165: Substitute air for steam to atomize oil | $17,943 | $12,000 | - | - |
$17,943
-
MMBtu
|
|
04 | 2.7232: Replace existing hvac unit with high efficiency model | $12,453 | $7,000 |
$7,335
152,229
kWh
|
$5,118
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,040 | $45,048 |
$7,949
162,980
kWh
|
$2,091
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,176 | $60 |
$7,473
219,154
kWh
|
$4,703
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,938 | $144 |
$3,795
111,378
kWh
|
$3,143
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $2,853 | $4,125 |
$2,853
51,506
kWh
|
- | - | |
TOTAL RECOMMENDED | $212,073 | $196,177 |
$150,590
3,267,379
kWh
|
$43,540
-
kW-mo/yr
|
$17,943
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs