Assessment Year | 2015 |
---|---|
Principal Product | Aluminum Casting Equipment |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
165,000
ft2
|
Annual Production | 18
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,224 | 3,240,800 |
kWh
|
$0.072 |
Electricity Demand | $100,346 | 15,667 |
kW-mo/yr
|
$6.40 |
Natural Gas | $228,898 | 30,886 |
MMBtu
|
$7.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,434 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,002 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $15,523 | $200 |
$15,523
215,597
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,969 | $3,393 |
$1,554
21,584
kWh
|
$415
-
kW-mo/yr
|
|
03 | 2.7132: Install timers on light switches in little used areas | $638 | $259 |
$638
8,870
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $396 | $1,280 |
$353
4,896
kWh
|
$43
-
kW-mo/yr
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $909 | $15 |
$743
10,325
kWh
|
$165
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $19,434 | $5,147 |
$18,811
261,272
kWh
|
$623
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $3,002 | $4,932 |
$2,545
35,350
kWh
|
$458
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs