ITAC Assessment: BS0051
ITAC logo
ITAC Assessment: BS0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Aluminum Casting Equipment
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 165,000
ft2
Annual Production 18
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,224 3,240,800
kWh
Electricity Demand $100,346 15,667
kW-mo/yr
Natural Gas $228,898 30,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $15,523 $200 $15,523
215,597
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,969 $3,393 $1,554
21,584
kWh
$415
-
kW-mo/yr
03 2.7132: Install timers on light switches in little used areas $638 $259 $638
8,870
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $396 $1,280 $353
4,896
kWh
$43
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $909 $15 $743
10,325
kWh
$165
-
kW-mo/yr
TOTAL RECOMMENDED $19,434 $5,147 $18,811
261,272
kWh
$623
-
kW-mo/yr
TOTAL IMPLEMENTED $3,002 $4,932 $2,545
35,350
kWh
$458
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs