Assessment Year | 2011 |
---|---|
Principal Product | fabricated metal structural components |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 19 |
Plant Area |
50,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 4,050
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,725 | 2,117,360 |
kWh
|
$0.064 |
Electricity Demand | $3,326 | 1,838 |
kW-mo/yr
|
$1.81 |
LPG | $37,000 | 2,200 |
MMBtu
|
$16.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,189 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,528 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $232 | $480 |
$232
3,228
kWh
|
- | |
02 | 2.6122: Adjust vents to minimize energy use | $1,007 | $240 |
$1,007
15,049
kWh
|
- | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $886 | $3,000 | - |
$886
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,168 | $1,200 |
$3,168
49,499
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,660 | $50 |
$3,660
57,191
kWh
|
- | |
06 | 2.6127: Maintain air filters by cleaning or replacement | $1,235 | $2,700 |
$1,235
19,217
kWh
|
- | |
TOTAL RECOMMENDED | $10,189 | $7,670 |
$9,302
144,184
kWh
|
$886
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $6,528 | $7,620 |
$5,642
86,993
kWh
|
$886
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs