Assessment Year | 2011 |
---|---|
Principal Product | Chisels, bars and punches |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
21,000
ft2
|
Annual Production | 1,500,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,719 | 1,059,136 |
kWh
|
$0.094 |
Electricity Demand | $35,353 | 3,378 |
kW-mo/yr
|
$10.47 |
Electricity Fees | $7,800 | - |
|
- |
LPG | $151,478 | 6,981 |
MMBtu
|
$21.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,487 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,995 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $4,145 | $1,370 | - |
$4,145
-
MMBtu
|
|
02 | 2.2212: Use minimum safe oven ventilation | $3,752 | $490 | - |
$3,752
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,772 | $540 |
$3,772
40,127
kWh
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $3,179 | $8,435 |
$3,179
33,818
kWh
|
- | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,432 | $6,475 |
$1,432
15,237
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,078 | $200 |
$1,078
11,473
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $743 | $1,800 |
$743
7,094
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $386 | $450 | - |
$386
-
MMBtu
|
|
TOTAL RECOMMENDED | $18,487 | $19,760 |
$10,204
107,749
kWh
|
$8,283
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,995 | $2,110 |
$4,850
51,600
kWh
|
$4,145
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs