| Assessment Year | 1999 |
|---|---|
| Principal Product | wooden pallets |
| NAICS |
n/a
|
| SIC | 2448: Wood Pallets and Skids |
| Sales Range | $5 M to 10M |
| # of Employees | 60 |
| Plant Area |
40,000
ft2
|
| Annual Production | 6,000
thousand feet
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $13,392 | 791,325 |
kWh
|
$0.017 |
| Electricity Demand | $35,889 | 2,664 |
kW-mo/yr
|
$13.47 |
| Electricity Fees | $1,579 | - |
|
- |
| Natural Gas | $13,872 | 3,368 |
MMBtu
|
$4.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,030 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,030 | $150 |
$300
11,723
kWh
|
$730
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,610 | $1,400 | - |
$1,610
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $380 | $50 |
$80
4,982
kWh
|
$300
-
kW-mo/yr
|
- | - | - | |
| 04 | 3.8135: Use low voc or water based paint | $10,460 | $5,000 | - | - |
$(-2,420.0)
-
gal
|
- | $12,880 | |
| 05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,230 | $2,500 | - | - | - |
$3,230
-
lb
|
- | |
| 06 | 3.5313: Increase amount of waste recovered for resale | $1,470 | $3,000 | - | - | - |
$1,470
-
lb
|
- | |
| TOTAL RECOMMENDED | $18,180 | $12,100 |
$380
16,705
kWh
|
$2,640
-
kW-mo/yr
|
$(-2,420.0)
-
gal
|
$4,700
-
lb
|
$12,880 | ||
| TOTAL IMPLEMENTED | $1,030 | $150 |
$300
11,723
kWh
|
$730
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs