ITAC Assessment: SU0445
ITAC logo
ITAC Assessment: SU0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Custom Fabricated Products
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 76,000
ft2
Annual Production 378
units
Production Hrs. Annual 2,360
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,491 1,079,109
kWh
Electricity Demand $47,990 4,547
kW-mo/yr
Electricity Fees $3,907 -
Natural Gas $42,687 7,497
MMBtu
TOTAL YEARLY COSTS $109,075
RECOMMENDED SAVINGS* $3,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $122 - $16
1,258
kWh
$106
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $2,399 $3,850 $119
9,180
kWh
$2,280
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $368 $750 $32
2,453
kWh
$36
-
kW-mo/yr
- $270 $30
04 2.2136: Install / repair insulation on steam lines $62 $237 - - $62
-
MMBtu
- -
05 2.7224: Reduce space conditioning during non-working hours $430 $1,799 - - $430
-
MMBtu
- -
TOTAL RECOMMENDED $3,381 $6,636 $167
12,891
kWh
$2,422
-
kW-mo/yr
$492
-
MMBtu
$270 $30
TOTAL IMPLEMENTED $3,381 $6,636 $167
12,891
kWh
$2,422
-
kW-mo/yr
$492
-
MMBtu
$270 $30
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs