ITAC Assessment: MI0208
ITAC logo
ITAC Assessment: MI0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Medical Instruments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 170,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $401,112 7,040,000
kWh
Electricity Demand $125,105 12,940
kW-mo/yr
Electricity Fees $44,588 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $40,370 $292,600 $27,940
465,667
kWh
$12,430
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $28,143 $16,918 $21,384
356,414
kWh
$6,759
-
kW-mo/yr
03 2.7496: Install partitions to reduce size of conditioned space $25,727 $48,170 $19,548
325,793
kWh
$6,179
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $16,075 $2,550 $12,217
203,620
kWh
$3,858
-
kW-mo/yr
05 2.7447: Install vinyl strip / high speed / air curtain doors $11,241 $20,530 $8,543
142,388
kWh
$2,698
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,355 $1,320 $3,311
55,182
kWh
$1,044
-
kW-mo/yr
07 2.4239: Eliminate or reduce compressed air usage $1,789 $2,400 $1,364
22,715
kWh
$425
-
kW-mo/yr
TOTAL RECOMMENDED $127,700 $384,488 $94,307
1,571,779
kWh
$33,393
-
kW-mo/yr
TOTAL IMPLEMENTED $100,384 $361,408 $73,547
1,225,771
kWh
$26,837
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs