ITAC Assessment: UD0613
ITAC logo
ITAC Assessment: UD0613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Metal Finishing
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 54,555
ft2
Annual Production 59,330
lb
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,550 4,323,280
kWh
Electricity Demand $140,085 9,900
kW-mo/yr
Natural Gas $196,021 34,402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,027

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings Primary Product Savings
01 3.4159: Replace treated water with well / surface water $21,501 $15,000 $(-289.0)
(-13,770)
kWh
$(-382.0)
-
kW-mo/yr
- - - - - $22,172
-
Tgal
-
02 4.111: Add equipment/ operators to reduce production bottleneck $15,606 $14,000 - - - - - - - - $15,606
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,566 - $2,983
142,045
kWh
$3,583
-
kW-mo/yr
- - - - - - -
04 3.1227: Use counter-current rinsing to reduce rinse water volume (gravure) $5,513 $5,000 - - $1,693
-
Tgal
$1,474
-
gal
$168
-
lb
$2,178 - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,342 - - $8,931
-
kW-mo/yr
- - - - $(-7,589.0) - -
TOTAL RECOMMENDED $50,528 $34,000 $2,694
128,275
kWh
$12,132
-
kW-mo/yr
$1,693
-
Tgal
$1,474
-
gal
$168
-
lb
$2,178 $(-7,589.0) $22,172
-
Tgal
$15,606
TOTAL IMPLEMENTED $29,027 $19,000 $2,983
142,045
kWh
$12,514
-
kW-mo/yr
$1,693
-
Tgal
$1,474
-
gal
$168
-
lb
$2,178 $(-7,589.0) - $15,606
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs