ITAC Assessment: MS0161
ITAC logo
ITAC Assessment: MS0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Bottle Closures
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 221
Plant Area 80,000
ft2
Annual Production 4,000,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $628,105 18,657,679
kWh
Electricity Demand $354,457 31,716
kW-mo/yr
Electricity Fees $(-49,998.0) -
Natural Gas $15,725 3,691
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,432

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $6,141 $1,870 $5,771
171,454
kWh
$279
-
kW-mo/yr
$91 - -
02 2.4314: Use synthetic lubricant $7,432 $660 $5,147
152,989
kWh
$2,175
-
kW-mo/yr
$110 - -
03 2.7229: Air condition only space necessary $6,113 $3,530 $4,057
120,457
kWh
$1,965
-
kW-mo/yr
$91 - -
04 3.6124: Burn waste oil for heat $1,062 $2,067 - - - $562
-
MMBtu
$500
-
gal
TOTAL RECOMMENDED $20,748 $8,127 $14,975
444,900
kWh
$4,419
-
kW-mo/yr
$292 $562
-
MMBtu
$500
-
gal
TOTAL IMPLEMENTED $7,432 $660 $5,147
152,989
kWh
$2,175
-
kW-mo/yr
$110 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs