Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,200

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0083 #06 Y:2026 Reschedule and rearrange multiple-source heating systems $4,945 -
MU0083 #05 Y:2026 Install occupancy sensors $233 $1,209
MU0083 #04 Y:2026 Eliminate or reduce compressed air usage $1,914 $1,793
MU0083 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $1,057 -
MU0083 #02 Y:2026 Reduce space conditioning during non-working hours $15,130 -
MU0083 #01 Y:2026 Recover heat from exhausted steam, hot air or hot water $23,488 $132,000
UA0307 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,257 $2,370
UA0307 #05 Y:2026 Replace existing hvac unit with high efficiency model $302,698 $709,755
UA0307 #04 Y:2026 Install timers and/or thermostats $23,914 $1,281
UA0307 #03 Y:2026 Recover waste heat from equipment $20,476 $25,151
UA0307 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $10,775 $37,374
UA0307 #01 Y:2026 Change rate schedules or other changes in utility service $23,449 $800
MS0465 #07 Y:2026 Apply for tax-free status for energy purchases $7,003 -
MS0465 #06 Y:2026 Clean or color roof to reduce solar load $4,092 $42,669
MS0465 #05 Y:2026 Lower temperature during the winter season and vice-versa $4,474 -
MS0465 #04 Y:2026 Reschedule and rearrange multiple-source heating systems $14,437 -
MS0465 #03 Y:2026 Keep doors and windows shut when not on use $39,664 $104,260
MS0465 #02 Y:2026 Purchase new equipment to reduce material use / cost $398 $1,280
MS0465 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $408 $2,243
UC2602 #07 Y:2026 Modify workload $179,050 $86,700