| Assessment Year | 2026 |
|---|---|
| Principal Product | Automobile Parts |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3365: Aluminum Foundries |
| Sales Range | $100 M to 500M |
| # of Employees | 145 |
| Plant Area |
477,814
ft2
|
| Annual Production | 627,800
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,625,245 | 47,929,133 |
kWh
|
$0.076 |
| Electricity Demand | $428,998 | 90,959 |
kW-mo/yr
|
$4.72 |
| Electricity Fees | $(-416,772.0) | - |
|
- |
| Natural Gas | $1,310,759 | 283,744 |
MMBtu
|
$4.62 |
| TOTAL YEARLY COSTS | $4,948,230 | |||
| RECOMMENDED SAVINGS* | $382,569 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $23,449 | $800 | - | - | $23,449 | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,775 | $37,374 |
$11,060
146,291
kWh
|
$949
-
kW-mo/yr
|
$(-1,234.0) | - | |
| 03 | 2.2437: Recover waste heat from equipment | $20,476 | $25,151 | - | - | - |
$20,476
-
MMBtu
|
|
| 04 | 2.7261: Install timers and/or thermostats | $23,914 | $1,281 |
$26,654
352,561
kWh
|
- | $(-2,740.0) | - | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $302,698 | $709,755 |
$292,677
3,871,392
kWh
|
$44,704
-
kW-mo/yr
|
$(-34,683.0) | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,257 | $2,370 |
$1,274
16,854
kWh
|
$127
-
kW-mo/yr
|
$(-144.0) | - | |
| TOTAL RECOMMENDED | $382,569 | $776,731 |
$331,665
4,387,098
kWh
|
$45,780
-
kW-mo/yr
|
$(-15,352.0) |
$20,476
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs