ITAC Assessment: AS0107
ITAC logo
ITAC Assessment: AS0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Aerospace Components
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 25,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,986 1,164,127
kWh
Natural Gas $637 44
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,764 $5,283 $8,764
86,460
kWh
02 2.7232: Replace existing hvac unit with high efficiency model $4,565 $12,000 $4,565
45,135
kWh
03 2.7444: Close holes and openings in building such as broken windows $202 - $202
2,052
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,758 $1,000 $8,758
86,460
kWh
05 2.4314: Use synthetic lubricant $3,017 $1,098 $3,017
29,894
kWh
06 2.4133: Use most efficient type of electric motors $1,256 $975 $1,256
12,309
kWh
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $614 - $614
6,155
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $116 $100 $116
1,172
kWh
TOTAL RECOMMENDED $27,292 $20,456 $27,292
269,637
kWh
TOTAL IMPLEMENTED $23,957 $19,258 $23,957
236,519
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs