ITAC Assessment: UC2602
ITAC logo
ITAC Assessment: UC2602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Electromagnetic Coils
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area 30,000
ft2
Annual Production 1,600,000
units
Production Hrs. Annual 4,316
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,090 662,374
kWh
Electricity Demand $46,677 3,079
kW-mo/yr
Electricity Fees $12,713 -
Natural Gas $14,040 1,597
MMBtu
TOTAL YEARLY COSTS $206,520
RECOMMENDED SAVINGS* $1,585,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,241 $358 $1,957
9,739
kWh
$284
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $786 - $633
3,151
kWh
$153
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $1,925 $1,400 $1,855
9,233
kWh
$69
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $1,473 $2,600 $1,432
7,161
kWh
$41
-
kW-mo/yr
- -
05 3.2176: Increase use of automation $200,000 $600,000 - - $200,000 -
06 3.2176: Increase use of automation $1,200,000 $340,000 - - $1,200,000 -
07 4.426: Modify workload $179,050 $86,700 - - - $179,050
TOTAL RECOMMENDED $1,585,475 $1,031,058 $5,877
29,284
kWh
$547
-
kW-mo/yr
$1,400,000 $179,050
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs