3,332
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0791 #07 Y:2010 | 07 | 2010 | Use waste heat from hot flue gases to preheat | $3,122 | $8,027 | |
| OK0791 #06 Y:2010 | 06 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $4,392 | $12,540 | |
| OK0791 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $1,255 | $3,402 | |
| OK0791 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $900 | $3,735 | |
| OK0791 #03 Y:2010 | 03 | 2010 | Utilize higher efficiency lamps and/or ballasts | $21,782 | $61,666 | |
| OK0791 #02 Y:2010 | 02 | 2010 | Shut off cooling if cold outside air will cool process | $3,321 | $7,025 | |
| OK0791 #01 Y:2010 | 01 | 2010 | Recover waste heat from equipment | $65,369 | $268,762 | |
| OR0556 #08 Y:2010 | 08 | 2010 | Use solar heat to make electricty | $16,479 | $65,003 | |
| OR0556 #07 Y:2010 | 07 | 2010 | Eliminate or reduce compressed air usage | $5,397 | $11,734 | |
| OR0556 #06 Y:2010 | 06 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,320 | $2,320 | |
| OR0556 #05 Y:2010 | 05 | 2010 | Reduce combustion air flow to optimum | $3,131 | $2,861 | |
| OR0556 #04 Y:2010 | 04 | 2010 | Eliminate or reduce compressed air usage | $8,987 | $5,125 | |
| OR0556 #03 Y:2010 | 03 | 2010 | Optimize production lot sizes and inventories | $8,900 | $8,900 | |
| OR0556 #02 Y:2010 | 02 | 2010 | Install equipment (eg compactor) to reduce disposal costs | $1,765 | - | |
| OR0556 #01 Y:2010 | 01 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $542 | - | |
| UW0040 #03 Y:2010 | 03 | 2010 | Utilize higher efficiency lamps and/or ballasts | $16,477 | $32,020 | |
| UW0040 #02 Y:2010 | 02 | 2010 | Keep boiler tubes clean | $82,215 | $50,000 | |
| UW0040 #01 Y:2010 | 01 | 2010 | Use waste heat from hot flue gases to preheat incoming fluids | $977,184 | $420,000 | |
| UM0369 #10 Y:2010 | 10 | 2010 | Analyze flue gas for proper air/fuel ratio | $1,010 | $1,300 | |
| UM0369 #09 Y:2010 | 09 | 2010 | Use waste heat from hot flue gases to preheat | $1,164 | $1,000 |