Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0791 #07 Y:2010 Use waste heat from hot flue gases to preheat $3,122 $8,027
OK0791 #06 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $4,392 $12,540
OK0791 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $1,255 $3,402
OK0791 #04 Y:2010 Utilize higher efficiency lamps and/or ballasts $900 $3,735
OK0791 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $21,782 $61,666
OK0791 #02 Y:2010 Shut off cooling if cold outside air will cool process $3,321 $7,025
OK0791 #01 Y:2010 Recover waste heat from equipment $65,369 $268,762
OR0556 #08 Y:2010 Use solar heat to make electricty $16,479 $65,003
OR0556 #07 Y:2010 Eliminate or reduce compressed air usage $5,397 $11,734
OR0556 #06 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $2,320 $2,320
OR0556 #05 Y:2010 Reduce combustion air flow to optimum $3,131 $2,861
OR0556 #04 Y:2010 Eliminate or reduce compressed air usage $8,987 $5,125
OR0556 #03 Y:2010 Optimize production lot sizes and inventories $8,900 $8,900
OR0556 #02 Y:2010 Install equipment (eg compactor) to reduce disposal costs $1,765 -
OR0556 #01 Y:2010 Utilize energy-efficient belts and other improved mechanisms $542 -
UW0040 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $16,477 $32,020
UW0040 #02 Y:2010 Keep boiler tubes clean $82,215 $50,000
UW0040 #01 Y:2010 Use waste heat from hot flue gases to preheat incoming fluids $977,184 $420,000
UM0369 #10 Y:2010 Analyze flue gas for proper air/fuel ratio $1,010 $1,300
UM0369 #09 Y:2010 Use waste heat from hot flue gases to preheat $1,164 $1,000