ITAC Assessment: UW0040
ITAC logo
ITAC Assessment: UW0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Corrugated Paper
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 40,000
ft2
Annual Production 50,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,790,795 1,020,810,394
kWh
Natural Gas $15,490,169 2,065,355
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,075,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,059,399

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $977,184 $420,000 - - $977,184
-
MMBtu
-
02 2.1232: Keep boiler tubes clean $82,215 $50,000 - - - $82,215
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,477 $32,020 $14,424
379,597
kWh
$2,053
-
kW-mo/yr
- -
TOTAL RECOMMENDED $1,075,876 $502,020 $14,424
379,597
kWh
$2,053
-
kW-mo/yr
$977,184
-
MMBtu
$82,215
-
MMBtu
TOTAL IMPLEMENTED $1,059,399 $470,000 - - $977,184
-
MMBtu
$82,215
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs