Assessment Year | 2008 |
---|---|
Principal Product | plastic containers |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
877,000
ft2
|
Annual Production | 295,699,564
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,346,074 | 46,883,372 |
kWh
|
$0.050 |
Electricity Demand | $131,850 | 168,449 |
kW-mo/yr
|
$0.78 |
Electricity Fees | $170,842 | - |
|
- |
Natural Gas | $80,664 | 9,284 |
MMBtu
|
$8.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $53,385 | $253,134 |
$51,883
1,037,661
kWh
|
$1,502
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $374 | $600 |
$309
6,179
kWh
|
$65
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $699 | $700 |
$433
8,655
kWh
|
$8
-
kW-mo/yr
|
- | - | $258 | |
04 | 2.4221: Install compressor air intakes in coolest locations | $18,734 | $6,000 |
$18,376
367,526
kWh
|
$358
-
kW-mo/yr
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $15,592 | $20,350 |
$15,294
305,889
kWh
|
$298
-
kW-mo/yr
|
- | - | - | |
06 | 2.7231: Use radiant heater for spot heating | $2,435 | $3,180 | - | - | - |
$2,435
-
MMBtu
|
- | |
07 | 4.454: Modify startup/shutdown times | $11,838 | $18,000 | - | - | $11,838 | - | - | |
TOTAL RECOMMENDED | $103,057 | $301,964 |
$86,295
1,725,910
kWh
|
$2,231
-
kW-mo/yr
|
$11,838 |
$2,435
-
MMBtu
|
$258 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs