Assessment Year | 2010 |
---|---|
Principal Product | Frozen Dough |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
100,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 4,320
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,101,382 | 15,934,800 |
kWh
|
$0.069 |
Electricity Demand | $145,264 | 29,467 |
kW-mo/yr
|
$4.93 |
Natural Gas | $160,600 | 22,515 |
MMBtu
|
$7.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,087 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,919 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $65,369 | $268,762 | - | - |
$65,369
-
MMBtu
|
|
02 | 2.2691: Shut off cooling if cold outside air will cool process | $3,321 | $7,025 |
$3,321
48,064
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,782 | $61,666 |
$21,782
315,220
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $900 | $3,735 |
$900
13,022
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,255 | $3,402 |
$1,255
18,168
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,392 | $12,540 |
$4,392
63,569
kWh
|
- | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $3,122 | $8,027 | - | - |
$3,122
-
MMBtu
|
|
08 | 2.2414: Use waste heat from hot flue gases to preheat | $1,026 | $11,800 | - | - |
$1,026
-
MMBtu
|
|
09 | 2.2136: Install / repair insulation on steam lines | $2,130 | $1,244 | - | - |
$2,130
-
MMBtu
|
|
10 | 2.4221: Install compressor air intakes in coolest locations | $1,687 | $915 |
$1,687
24,428
kWh
|
- | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,764 | $1,050 |
$1,764
25,541
kWh
|
- | - | |
12 | 2.3132: Recharge batteries on during off-peak demand periods | $655 | - | - |
$655
-
kW-mo/yr
|
- | |
13 | 2.6232: Install set-back timers | $684 | $1,024 | - | - |
$684
-
MMBtu
|
|
TOTAL RECOMMENDED | $108,087 | $381,190 |
$35,101
508,012
kWh
|
$655
-
kW-mo/yr
|
$72,331
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,919 | $8,187 |
$3,919
56,731
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs