ITAC Assessment: MZ0290
ITAC logo
ITAC Assessment: MZ0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Plastic Packaging
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 61,425
ft2
Annual Production 200,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,362 6,835,959
kWh
Electricity Demand $55,038 15,696
kW-mo/yr
Electricity Fees $2,545 -
Natural Gas $11,628 1,433
MMBtu
Waste Disposal Costs
Water Usage $33,499 7,356
Tgal
TOTAL YEARLY COSTS $579,072
RECOMMENDED SAVINGS* $12,683 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4224: Upgrade controls on compressors $4,714 $3,096 $4,223
60,584
kWh
$491
-
kW-mo/yr
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,851 $3,250 - $1,851
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,559 $1,091 $1,611
23,120
kWh
$187
-
kW-mo/yr
$(-240.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,247 $2,264 $1,117
16,024
kWh
$130
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,411 $298 $1,264
18,129
kWh
$147
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,134 $4,935 $1,016
14,579
kWh
$118
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $767 $1,272 $630
9,040
kWh
$137
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,683 $16,206 $9,861
141,476
kWh
$3,061
-
kW-mo/yr
$(-240.0)
TOTAL IMPLEMENTED $10,065 $11,684 $9,231
132,436
kWh
$1,073
-
kW-mo/yr
$(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs