Assessment Year | 2010 |
---|---|
Principal Product | Processed steel coils |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3465: Automotive Stampings |
Sales Range | $50 M to 100M |
# of Employees | 90 |
Plant Area |
400,000
ft2
|
Annual Production | 500,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,631 | 4,435,480 |
kWh
|
$0.045 |
Electricity Demand | $173,515 | 10,832 |
kW-mo/yr
|
$16.02 |
Natural Gas | $118,639 | 19,434 |
MMBtu
|
$6.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,278 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $8,910 | $1,680 |
$8,910
197,000
kWh
|
- | - | |
02 | 2.6211: Conserve energy by efficient use of vending machines | $4,068 | $10 |
$896
19,800
kWh
|
$3,172
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $695 | $2,500 |
$695
9,834
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $443 | $2,210 |
$283
6,256
kWh
|
$160
-
kW-mo/yr
|
- | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $12,318 | $21,700 | - | - |
$12,318
-
MMBtu
|
|
06 | 2.7442: Keep doors and windows shut when not on use | $11,181 | $2,254 | - | - |
$11,181
-
MMBtu
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,409 | $1,874 | - | - |
$1,409
-
MMBtu
|
|
08 | 2.2123: Insulate feedwater tank | $1,281 | $1,449 | - | - |
$1,281
-
MMBtu
|
|
09 | 2.2414: Use waste heat from hot flue gases to preheat | $1,164 | $1,000 | - | - |
$1,164
-
MMBtu
|
|
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,010 | $1,300 | - | - |
$1,010
-
MMBtu
|
|
TOTAL RECOMMENDED | $42,479 | $35,977 |
$10,784
232,890
kWh
|
$3,332
-
kW-mo/yr
|
$28,363
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,278 | $30,434 |
$9,605
206,834
kWh
|
- |
$25,673
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs