Assessment Year | 1997 |
---|---|
Principal Product | aerial manlifts |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
180,000
ft2
|
Annual Production | 2,000
pieces
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $130,408 | 5,593,787 |
kWh
|
$0.023 |
Electricity Demand | $170,663 | 12,751 |
kW-mo/yr
|
$13.38 |
Electricity Fees | $157 | - |
|
- |
Natural Gas | $135,021 | 43,681 |
MMBtu
|
$3.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $124,887 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $6,360 | $6,100 |
$1,140
63,892
kWh
|
$5,220
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $2,510 | $400 | - | - |
$2,510
-
MMBtu
|
- | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,180 | $320 |
$490
27,257
kWh
|
$690
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $197 | $322 |
$73
4,103
kWh
|
$124
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $6,410 | $13,700 | - | - | - |
$2,260
-
gal
|
- | $2,640 | $1,510 | - | |
06 | 3.4156: Use flow control valves on equipment to optimize water use | $2,370 | $420 | - | - | - | - | - | - | - |
$2,370
-
Tgal
|
|
07 | 3.2121: Convert to electrostatic powder coating | $105,860 | $99,400 | - | - |
$(-4,880.0)
-
MMBtu
|
- |
$3,250
-
gal
|
$7,280 | $100,210 | - | |
08 | 4.621: Use fixtures to reduce machine changeout times | $8,650 | $10,000 | - | - | - | - |
$4,370
-
gal
|
$4,280 | - | - | |
TOTAL RECOMMENDED | $133,537 | $130,662 |
$1,703
95,252
kWh
|
$6,034
-
kW-mo/yr
|
$(-2,370.0)
-
MMBtu
|
$2,260
-
gal
|
$7,620
-
gal
|
$14,200 | $101,720 |
$2,370
-
Tgal
|
||
TOTAL IMPLEMENTED | $124,887 | $120,662 |
$1,703
95,252
kWh
|
$6,034
-
kW-mo/yr
|
$(-2,370.0)
-
MMBtu
|
$2,260
-
gal
|
$3,250
-
gal
|
$9,920 | $101,720 |
$2,370
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs