| Assessment Year | 1983 |
|---|---|
| Principal Product | TANKS & PRESSURE VESSELS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,232 | 1,427,902 |
kWh
|
$0.074 |
| Natural Gas | $15,516 | 3,704 |
MMBtu
|
$4.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,598 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,346 | $15,332 |
$2,346
31,946
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,103 | - |
$2,103
28,429
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $3,127 | - |
$3,127
42,497
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,405 | $125 |
$2,405
32,532
kWh
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $2,490 | $2,000 | - |
$2,490
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,127 | $6,290 |
$3,127
42,497
kWh
|
- | |
| TOTAL RECOMMENDED | $15,598 | $23,747 |
$13,108
177,901
kWh
|
$2,490
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs