ITAC Assessment: GT0160
ITAC logo
ITAC Assessment: GT0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product TANKS & PRESSURE VESSELS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,232 1,427,902
kWh
Natural Gas $15,516 3,704
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,346 $15,332 $2,346
31,946
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,103 - $2,103
28,429
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $3,127 - $3,127
42,497
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,405 $125 $2,405
32,532
kWh
-
05 2.7261: Install timers and/or thermostats $2,490 $2,000 - $2,490
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,127 $6,290 $3,127
42,497
kWh
-
TOTAL RECOMMENDED $15,598 $23,747 $13,108
177,901
kWh
$2,490
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs