Assessment Year | 1983 |
---|---|
Principal Product | TANKS & PRESSURE VESSELS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,232 | 1,427,902 |
kWh
|
$0.074 |
Natural Gas | $15,516 | 3,704 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,598 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,346 | $15,332 |
$2,346
31,946
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,103 | - |
$2,103
28,429
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,127 | - |
$3,127
42,497
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,405 | $125 |
$2,405
32,532
kWh
|
- | |
05 | 2.7261: Install timers and/or thermostats | $2,490 | $2,000 | - |
$2,490
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,127 | $6,290 |
$3,127
42,497
kWh
|
- | |
TOTAL RECOMMENDED | $15,598 | $23,747 |
$13,108
177,901
kWh
|
$2,490
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs