ITAC Assessment: SD0471
ITAC logo
ITAC Assessment: SD0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 731,808
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,816
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,861,034 22,206,752
kWh
Electricity Demand $710,804 49,116
kW-mo/yr
Natural Gas $889,054 194,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,204,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,475

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $629,471 $234,900 $190,406
2,272,145
kWh
- $439,065
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $277,284 $353,400 $318,829
3,804,644
kWh
$75,428
-
kW-mo/yr
$(-78,927.0)
-
MMBtu
$(-38,046.0)
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $92,696 $131,400 $72,726
867,856
kWh
$36,848
-
kW-mo/yr
$(-16,878.0)
-
MMBtu
-
04 2.4134: Replace electric motor with fossil fuel engine $79,351 $96,000 - - $79,351
-
MMBtu
-
05 2.4321: Upgrade obsolete equipment $34,337 $110,000 $34,337
409,746
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $31,423 $100,248 $24,093
287,534
kWh
$7,330
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $23,316 $500 $23,316
278,231
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,126 $3,300 $21,126
252,106
kWh
- - -
09 2.2414: Use waste heat from hot flue gases to preheat $13,810 $18,500 - - $13,810
-
MMBtu
-
10 2.2135: Repair and eliminate steam leaks $1,926 $200 - - $1,926
-
MMBtu
-
TOTAL RECOMMENDED $1,204,740 $1,048,448 $684,833
8,172,262
kWh
$119,606
-
kW-mo/yr
$438,347
-
MMBtu
$(-38,046.0)
TOTAL IMPLEMENTED $54,475 $103,748 $45,219
539,640
kWh
$7,330
-
kW-mo/yr
$1,926
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs