Assessment Year | 2013 |
---|---|
Principal Product | beverages |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 185 |
Plant Area |
731,808
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 6,816
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,861,034 | 22,206,752 |
kWh
|
$0.084 |
Electricity Demand | $710,804 | 49,116 |
kW-mo/yr
|
$14.47 |
Natural Gas | $889,054 | 194,968 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,204,740 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,475 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $629,471 | $234,900 |
$190,406
2,272,145
kWh
|
- |
$439,065
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $277,284 | $353,400 |
$318,829
3,804,644
kWh
|
$75,428
-
kW-mo/yr
|
$(-78,927.0)
-
MMBtu
|
$(-38,046.0) | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $92,696 | $131,400 |
$72,726
867,856
kWh
|
$36,848
-
kW-mo/yr
|
$(-16,878.0)
-
MMBtu
|
- | |
04 | 2.4134: Replace electric motor with fossil fuel engine | $79,351 | $96,000 | - | - |
$79,351
-
MMBtu
|
- | |
05 | 2.4321: Upgrade obsolete equipment | $34,337 | $110,000 |
$34,337
409,746
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,423 | $100,248 |
$24,093
287,534
kWh
|
$7,330
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $23,316 | $500 |
$23,316
278,231
kWh
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,126 | $3,300 |
$21,126
252,106
kWh
|
- | - | - | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $13,810 | $18,500 | - | - |
$13,810
-
MMBtu
|
- | |
10 | 2.2135: Repair and eliminate steam leaks | $1,926 | $200 | - | - |
$1,926
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $1,204,740 | $1,048,448 |
$684,833
8,172,262
kWh
|
$119,606
-
kW-mo/yr
|
$438,347
-
MMBtu
|
$(-38,046.0) | ||
TOTAL IMPLEMENTED | $54,475 | $103,748 |
$45,219
539,640
kWh
|
$7,330
-
kW-mo/yr
|
$1,926
-
MMBtu
|
- | ||