ITAC Assessment: MI0249
ITAC logo
ITAC Assessment: MI0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 500,000
ft2
Annual Production 200,000
ton
Production Hrs. Annual 2,964
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,365 912,720
kWh
Electricity Demand $46,994 4,693
kW-mo/yr
Electricity Fees $15,352 -
Natural Gas $670,266 170,724
MMBtu
Fuel Oil #2 $3,600,000 126,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,921,158 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,874,270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1332: Convert combustion equipment to burn natural gas $1,845,922 $2,000,000 - - - $1,845,922
-
MMBtu
02 2.2511: Insulate bare equipment $38,483 $20,790 - - $38,483
-
MMBtu
-
03 2.8226: Increase efficiency of trucks $14,224 $11,600 - - - $14,224
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,076 $13,090 $5,283
99,674
kWh
$2,793
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $5,223 $2,520 - - $5,223
-
MMBtu
-
06 2.6127: Maintain air filters by cleaning or replacement $2,451 $347 $1,387
26,167
kWh
$1,064
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,546 $1,660 $1,167
22,024
kWh
$2,379
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,904 $80 $1,756
33,140
kWh
$1,148
-
kW-mo/yr
- -
09 2.2136: Install / repair insulation on steam lines $329 $1,104 - - $329
-
MMBtu
-
TOTAL RECOMMENDED $1,921,158 $2,051,191 $9,593
181,005
kWh
$7,384
-
kW-mo/yr
$44,035
-
MMBtu
$1,860,146
-
MMBtu
TOTAL IMPLEMENTED $1,874,270 $2,016,207 $4,310
81,331
kWh
$4,591
-
kW-mo/yr
$5,223
-
MMBtu
$1,860,146
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs