Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,123

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0148 #03 Y:2007 Use or replace with energy efficient substitutes $4,272 $10,200
MI0148 #02 Y:2007 Disconnect ballasts $5,169 $2,150
MI0148 #01 Y:2007 Lower temperature during the winter season and vice-versa $8,264 $915
DL0003 #10 Y:2007 Use solar heat to make electricty $1,470 $40,500
DL0003 #09 Y:2007 Establish equipment maintenance schedule $1,892 -
DL0003 #08 Y:2007 Replace boiler $4,572 $15,400
DL0003 #07 Y:2007 Install / repair insulation on steam lines $23,137 $20,000
DL0003 #06 Y:2007 Use waste heat from hot flue gases to preheat $51,975 $25,000
DL0003 #05 Y:2007 Analyze flue gas for proper air/fuel ratio $24,500 $10,000
DL0003 #04 Y:2007 Use minimum steam operating pressure $1,497 -
DL0003 #03 Y:2007 Analyze flue gas for proper air/fuel ratio $25,891 $2,000
DL0003 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $47,542 $92,679
DL0003 #01 Y:2007 Eliminate or reduce compressed air usage $14,287 $45,000
MI0147 #05 Y:2007 Reduce the pressure of compressed air to the minimum required $481 $30
MI0147 #04 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $3,950 $1,074
MI0147 #03 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $10,305 $7,878
MI0147 #02 Y:2007 Analyze flue gas for proper air/fuel ratio $10,498 $1,750
MI0147 #01 Y:2007 Use waste heat from hot flue gases to preheat $20,581 $16,000
IC0128 #10 Y:2007 Use most efficient type of electric motors $7,851 $30,665
IC0128 #09 Y:2007 Utilize higher efficiency lamps and/or ballasts $249 $260