Assessment Year | 2007 |
---|---|
Principal Product | Corrugated Cardboard Boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
230,000
ft2
|
Annual Production | 600,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $542,211 | 5,533,205 |
kWh
|
$0.098 |
Electricity Demand | $68,528 | 1,128 |
kW-mo/yr
|
$60.75 |
Electricity Fees | $3,450 | - |
|
- |
Natural Gas | $392,010 | 45,830 |
MMBtu
|
$8.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $196,763 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,526 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $14,287 | $45,000 |
$14,287
145,800
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $47,542 | $92,679 |
$46,731
477,122
kWh
|
$811
-
kW-mo/yr
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $25,891 | $2,000 | - | - |
$25,891
-
MMBtu
|
|
04 | 2.2163: Use minimum steam operating pressure | $1,497 | - | - | - |
$1,497
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $24,500 | $10,000 | - | - |
$24,500
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $51,975 | $25,000 | - | - |
$51,975
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $23,137 | $20,000 | - | - |
$23,137
-
MMBtu
|
|
08 | 2.1224: Replace boiler | $4,572 | $15,400 | - | - |
$4,572
-
MMBtu
|
|
09 | 2.6124: Establish equipment maintenance schedule | $1,892 | - | - | - |
$1,892
-
MMBtu
|
|
10 | 2.9114: Use solar heat to make electricty | $1,470 | $40,500 |
$1,470
15,000
kWh
|
- | - | |
TOTAL RECOMMENDED | $196,763 | $250,579 |
$62,488
637,922
kWh
|
$811
-
kW-mo/yr
|
$133,464
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,526 | $20,000 | - | - |
$26,526
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs