ITAC Assessment: MI0147
ITAC logo
ITAC Assessment: MI0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Beef
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 50,000
ft2
Annual Production 130,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,343 4,695,540
kWh
Electricity Demand $33,256 9,813
kW-mo/yr
Electricity Fees $32,470 -
LPG $161,747 11,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.2414: Use waste heat from hot flue gases to preheat $20,581 $16,000 - - $20,581
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $10,498 $1,750 - - - $10,498
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,305 $7,878 $9,326
208,546
kWh
$979
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,950 $1,074 $3,950
176,082
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $481 $30 $376
5,367
kWh
$105
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,815 $26,732 $13,652
389,995
kWh
$1,084
-
kW-mo/yr
$20,581
-
MMBtu
$10,498
-
MMBtu
TOTAL IMPLEMENTED $41,384 $25,628 $9,326
208,546
kWh
$979
-
kW-mo/yr
$20,581
-
MMBtu
$10,498
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs