ITAC Assessment: MI0148
ITAC logo
ITAC Assessment: MI0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Outboard motors
NAICS 333618: Other Engine Equipment Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 34,000
ft2
Annual Production 220,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,901 6,797,800
kWh
Electricity Demand $66,178 11,160
kW-mo/yr
Electricity Fees $39,532 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $8,264 $915 $7,000
155,553
kWh
$1,264
-
kW-mo/yr
02 2.7122: Disconnect ballasts $5,169 $2,150 $3,864
85,862
kWh
$1,305
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $4,272 $10,200 $3,360
59,997
kWh
$912
-
kW-mo/yr
04 2.7145: Install skylights $5,197 $16,736 $3,448
76,677
kWh
$1,749
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,440 $1,074 $1,921
34,309
kWh
$519
-
kW-mo/yr
06 2.4323: Use optimum size and capacity equipment $1,961 $3,010 $1,705
30,454
kWh
$256
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,128 $1,423 $874
15,610
kWh
$254
-
kW-mo/yr
08 2.7447: Install vinyl strip / high speed / air curtain doors $452 $160 $338
7,514
kWh
$114
-
kW-mo/yr
TOTAL RECOMMENDED $28,883 $35,668 $22,510
465,976
kWh
$6,373
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs