ITAC Assessment: UD0036
ITAC logo
ITAC Assessment: UD0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product VINYL,BUTYL & PLASTICS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 355
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $369,636 9,070,047
kWh
Natural Gas $102,653 27,317
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,160 $3,500 $10,160
252,931
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $11,000 $20,000 - $11,000
-
MMBtu
03 2.6121: Reduce hot water temperature to the minimum required $1,018 $112 $163
4,103
kWh
$855
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $3,120 $5,535 $2,387
58,617
kWh
$733
-
MMBtu
05 2.2437: Recover waste heat from equipment $1,834 $6,650 - $1,834
-
MMBtu
06 2.7314: Reduce ventilation air $3,333 $5 $143
3,517
kWh
$3,190
-
MMBtu
07 2.7243: Improve air circulation with destratification fans / other methods $2,551 $5,000 $2,551
62,720
kWh
-
TOTAL RECOMMENDED $33,016 $40,802 $15,404
381,888
kWh
$17,612
-
MMBtu
TOTAL IMPLEMENTED $3,120 $5,535 $2,387
58,617
kWh
$733
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs