Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,008

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL0184 #03 Y:1997 Modify process to reduce material use/cost $5,672 $90,000
UL0184 #02 Y:1997 Use heat in flue gases to preheat products or materials $9,676 $22,454
UL0184 #01 Y:1997 Use waste heat from hot flue gases to preheat $31,231 $59,862
UL0183 #06 Y:1997 Clear and rent existing space $130,000 $2,400
UL0183 #05 Y:1997 Insulate glazing, walls, ceilings, and roofs $40,200 $82,600
UL0183 #04 Y:1997 Reduce the pressure of compressed air to the minimum required $11,650 $40
UL0183 #03 Y:1997 Install compressor air intakes in coolest locations $4,200 $260
UL0183 #02 Y:1997 Use most efficient type of electric motors $151 $2,700
UL0183 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,385 $2,200
UL0182 #05 Y:1997 Install back-up equipment $23,221 $8,900
UL0182 #04 Y:1997 Separate and recycle scrap metal to foundry or for sale $23,221 $9,100
UL0182 #03 Y:1997 Convert to aqueous cleaning system $8,500 $12,200
UL0182 #02 Y:1997 Optimize plant power factor $15,253 $24,173
UL0182 #01 Y:1997 Reduce the pressure of compressed air to the minimum required $1,187 $20
UL0181 #07 Y:1997 Use absorption, extraction to remove contaminants $5,165 $60
UL0181 #06 Y:1997 Regenerate cleaning solvent on-site and reuse $19,550 $56,265
UL0181 #05 Y:1997 Utilize higher efficiency lamps and/or ballasts $476 $3,157
UL0181 #04 Y:1997 Insulate bare equipment $415 $263
UL0181 #03 Y:1997 Insulate bare equipment $3,388 $786
UL0181 #02 Y:1997 Use most efficient type of electric motors $350 $8,500