3,008
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL0184 #03 Y:1997 | 03 | 1997 | Modify process to reduce material use/cost | $5,672 | $90,000 | |
| UL0184 #02 Y:1997 | 02 | 1997 | Use heat in flue gases to preheat products or materials | $9,676 | $22,454 | |
| UL0184 #01 Y:1997 | 01 | 1997 | Use waste heat from hot flue gases to preheat | $31,231 | $59,862 | |
| UL0183 #06 Y:1997 | 06 | 1997 | Clear and rent existing space | $130,000 | $2,400 | |
| UL0183 #05 Y:1997 | 05 | 1997 | Insulate glazing, walls, ceilings, and roofs | $40,200 | $82,600 | |
| UL0183 #04 Y:1997 | 04 | 1997 | Reduce the pressure of compressed air to the minimum required | $11,650 | $40 | |
| UL0183 #03 Y:1997 | 03 | 1997 | Install compressor air intakes in coolest locations | $4,200 | $260 | |
| UL0183 #02 Y:1997 | 02 | 1997 | Use most efficient type of electric motors | $151 | $2,700 | |
| UL0183 #01 Y:1997 | 01 | 1997 | Utilize higher efficiency lamps and/or ballasts | $1,385 | $2,200 | |
| UL0182 #05 Y:1997 | 05 | 1997 | Install back-up equipment | $23,221 | $8,900 | |
| UL0182 #04 Y:1997 | 04 | 1997 | Separate and recycle scrap metal to foundry or for sale | $23,221 | $9,100 | |
| UL0182 #03 Y:1997 | 03 | 1997 | Convert to aqueous cleaning system | $8,500 | $12,200 | |
| UL0182 #02 Y:1997 | 02 | 1997 | Optimize plant power factor | $15,253 | $24,173 | |
| UL0182 #01 Y:1997 | 01 | 1997 | Reduce the pressure of compressed air to the minimum required | $1,187 | $20 | |
| UL0181 #07 Y:1997 | 07 | 1997 | Use absorption, extraction to remove contaminants | $5,165 | $60 | |
| UL0181 #06 Y:1997 | 06 | 1997 | Regenerate cleaning solvent on-site and reuse | $19,550 | $56,265 | |
| UL0181 #05 Y:1997 | 05 | 1997 | Utilize higher efficiency lamps and/or ballasts | $476 | $3,157 | |
| UL0181 #04 Y:1997 | 04 | 1997 | Insulate bare equipment | $415 | $263 | |
| UL0181 #03 Y:1997 | 03 | 1997 | Insulate bare equipment | $3,388 | $786 | |
| UL0181 #02 Y:1997 | 02 | 1997 | Use most efficient type of electric motors | $350 | $8,500 |