Assessment Year | 1997 |
---|---|
Principal Product | Aluminum Foil |
NAICS |
n/a
|
SIC | 3353: Aluminum Sheet, Plate, and Foil |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
350,000
ft2
|
Annual Production | 120,000,000
lb
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $666,786 | 26,803,928 |
kWh
|
$0.025 |
Electricity Demand | $376,317 | 51,912 |
kW-mo/yr
|
$7.25 |
Natural Gas | $76,491 | 18,861 |
MMBtu
|
$4.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $187,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $131,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,385 | $2,200 |
$947
40,445
kWh
|
$438
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $151 | $2,700 |
$100
4,103
kWh
|
$51
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $4,200 | $260 |
$2,900
116,061
kWh
|
$1,300
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,650 | $40 |
$8,050
323,271
kWh
|
$3,600
-
kW-mo/yr
|
- | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $40,200 | $82,600 | - | - |
$40,200
-
MMBtu
|
- | |
06 | 4.521: Clear and rent existing space | $130,000 | $2,400 | - | - | - | $130,000 | |
TOTAL RECOMMENDED | $187,586 | $90,200 |
$11,997
483,880
kWh
|
$5,389
-
kW-mo/yr
|
$40,200
-
MMBtu
|
$130,000 | ||
TOTAL IMPLEMENTED | $131,385 | $4,600 |
$947
40,445
kWh
|
$438
-
kW-mo/yr
|
- | $130,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs