| Assessment Year | 1998 |
|---|---|
| Principal Product | plastic injection molded parts |
| NAICS |
n/a
|
| SIC | 3079: |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
51,750
ft2
|
| Annual Production | 2,300
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $204,515 | 4,864,009 |
kWh
|
$0.042 |
| Electricity Demand | $63,101 | 11,100 |
kW-mo/yr
|
$5.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,770 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $5,370 | $15,320 |
$4,160
99,355
kWh
|
$1,210
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,520 | $4,600 |
$1,090
26,084
kWh
|
$430
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2511: Insulate bare equipment | $1,510 | $2,370 |
$1,170
28,136
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $450 | $540 |
$130
2,931
kWh
|
$20
-
kW-mo/yr
|
- | $300 | - | |
| 05 | 2.7132: Install timers on light switches in little used areas | $200 | $300 |
$200
4,689
kWh
|
- | - | - | - | |
| 06 | 3.1191: Change procedures / equipment / operating conditions | $23,230 | $12,470 | - | - |
$1,570
-
lb
|
$860 | $20,800 | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,560 | $5,000 | - | - |
$7,560
-
lb
|
- | - | |
| TOTAL RECOMMENDED | $39,840 | $40,600 |
$6,750
161,195
kWh
|
$2,000
-
kW-mo/yr
|
$9,130
-
lb
|
$1,160 | $20,800 | ||
| TOTAL IMPLEMENTED | $30,770 | $33,230 |
$5,580
133,059
kWh
|
$1,660
-
kW-mo/yr
|
$1,570
-
lb
|
$1,160 | $20,800 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs