ITAC Assessment: GT0962
ITAC logo
ITAC Assessment: GT0962
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Outerwear 100% Cotton Yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area 365,000
ft2
Annual Production 60,952,720
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,375,054 57,657,681
kWh
TOTAL YEARLY COSTS $4,375,054
RECOMMENDED SAVINGS* $241,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.3132: Recharge batteries on during off-peak demand periods $5,691 $200 - - $5,691
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $30,443 $1,850 $33,343
438,729
kWh
$(-2,900.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,943 $800 $9,943
130,829
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,117 $13,039 $12,117
159,432
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,615 $35,774 $14,615
192,300
kWh
- -
06 2.9114: Use solar heat to make electricty $169,075 $2,808,032 $169,075
2,228,201
kWh
- -
TOTAL RECOMMENDED $241,884 $2,859,695 $239,093
3,149,491
kWh
$(-2,900.0) $5,691
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs