Assessment Year | 2003 |
---|---|
Principal Product | Nickel and cobalt based alloys |
NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
115,000
ft2
|
Annual Production | 9
lb
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,317,371 | 34,415,892 |
kWh
|
$0.067 |
Electricity Demand | $522,522 | 57,202 |
kW-mo/yr
|
$9.13 |
Natural Gas | $1,027,588 | 141,006 |
MMBtu
|
$7.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $190,124 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $134,042 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $114,214 | $25,000 | - | - |
$114,214
-
MMBtu
|
|
02 | 2.2442: Preheat combustion air with waste heat | $20,766 | $1,500 | - | - |
$20,766
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,851 | $1,000 | - | - |
$19,851
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,480 | $5,000 | - | - |
$14,480
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $11,003 | $1,000 |
$9,095
135,753
kWh
|
$1,908
-
kW-mo/yr
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,825 | - |
$6,580
98,214
kWh
|
$2,245
-
kW-mo/yr
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $985 | - | - | - |
$985
-
MMBtu
|
|
TOTAL RECOMMENDED | $190,124 | $33,500 |
$15,675
233,967
kWh
|
$4,153
-
kW-mo/yr
|
$170,296
-
MMBtu
|
||
TOTAL IMPLEMENTED | $134,042 | $26,000 |
$15,675
233,967
kWh
|
$4,153
-
kW-mo/yr
|
$114,214
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs