| Assessment Year | 2025 |
|---|---|
| Principal Product | Steel and Aluminum Panels |
| NAICS | 331221: Rolled Steel Shape Manufacturing |
| SIC | 3316: Cold-Rolled Steel Sheet, Strip, and Bars |
| Sales Range | $10 M to 50M |
| # of Employees | 114 |
| Plant Area |
255,000
ft2
|
| Annual Production | 283,000
ton
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $556,595 | 5,346,443 |
kWh
|
$0.10 |
| Electricity Fees | $5,517 | - |
|
- |
| Natural Gas | $73,956 | 27,874 |
MMBtu
|
$2.65 |
| TOTAL YEARLY COSTS | $636,068 | |||
| RECOMMENDED SAVINGS* | $258,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,018 | - |
$8,018
77,024
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,881 | $3,780 |
$15,881
146,760
kWh
|
- | |
| 03 | 2.3212: Optimize plant power factor | $2,217 | $10,400 | - | $2,217 | |
| 04 | 2.8114: Change rate schedules or other changes in utility service | $43,408 | - | - | $43,408 | |
| 05 | 2.9114: Use solar heat to make electricty | $135,359 | $916,268 |
$135,359
1,300,207
kWh
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,831 | $3,900 |
$3,831
36,798
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,312 | $34,242 |
$49,312
473,694
kWh
|
- | |
| 08 | 2.7135: Install occupancy sensors | $149 | $254 |
$149
1,427
kWh
|
- | |
| TOTAL RECOMMENDED | $258,175 | $968,844 |
$212,550
2,035,910
kWh
|
$45,625 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs