ITAC Assessment: UL0182
ITAC logo
ITAC Assessment: UL0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Diesel Engine Parts and Machining
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 94,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,745 2,472,450
kWh
Electricity Demand $61,869 6,882
kW-mo/yr
Natural Gas $109,413 22,138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,187 $20 $628
25,791
kWh
$559
-
kW-mo/yr
- - - -
02 2.3212: Optimize plant power factor $15,253 $24,173 - - $15,253 - - -
03 3.8211: Convert to aqueous cleaning system $8,500 $12,200 - - - $8,500
-
lb
- -
04 3.5248: Separate and recycle scrap metal to foundry or for sale $23,221 $9,100 - - - - $23,221
-
lb
-
05 4.651: Install back-up equipment $23,221 $8,900 - - - - $1,009
-
lb
$22,212
TOTAL RECOMMENDED $71,382 $54,393 $628
25,791
kWh
$559
-
kW-mo/yr
$15,253 $8,500
-
lb
$24,230
-
lb
$22,212
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs