| Assessment Year | 1997 |
|---|---|
| Principal Product | Diesel Engine Parts and Machining |
| NAICS |
n/a
|
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
94,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,745 | 2,472,450 |
kWh
|
$0.028 |
| Electricity Demand | $61,869 | 6,882 |
kW-mo/yr
|
$8.99 |
| Natural Gas | $109,413 | 22,138 |
MMBtu
|
$4.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $71,382 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,187 | $20 |
$628
25,791
kWh
|
$559
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.3212: Optimize plant power factor | $15,253 | $24,173 | - | - | $15,253 | - | - | - | |
| 03 | 3.8211: Convert to aqueous cleaning system | $8,500 | $12,200 | - | - | - |
$8,500
-
lb
|
- | - | |
| 04 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $23,221 | $9,100 | - | - | - | - |
$23,221
-
lb
|
- | |
| 05 | 4.651: Install back-up equipment | $23,221 | $8,900 | - | - | - | - |
$1,009
-
lb
|
$22,212 | |
| TOTAL RECOMMENDED | $71,382 | $54,393 |
$628
25,791
kWh
|
$559
-
kW-mo/yr
|
$15,253 |
$8,500
-
lb
|
$24,230
-
lb
|
$22,212 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs