ITAC Assessment: UL0181
ITAC logo
ITAC Assessment: UL0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Automotive and Decorative Trim
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 62,000
ft2
Annual Production 480,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,596 5,162,954
kWh
Electricity Demand $67,780 12,008
kW-mo/yr
Natural Gas $45,584 9,164
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
01 2.4321: Upgrade obsolete equipment $139 - $139
5,862
kWh
- - - -
02 2.4133: Use most efficient type of electric motors $350 $8,500 $253
10,551
kWh
$97
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $3,388 $786 $4,459
186,694
kWh
$1,396
-
kW-mo/yr
$(-2,467.0)
-
MMBtu
- -
04 2.2511: Insulate bare equipment $415 $263 - - $415
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $476 $3,157 $319
13,189
kWh
$157
-
kW-mo/yr
- - -
06 3.8141: Regenerate cleaning solvent on-site and reuse $19,550 $56,265 - - - $19,550
-
gal
-
07 3.3126: Use absorption, extraction to remove contaminants $5,165 $60 - - - - $5,165
-
lb
TOTAL RECOMMENDED $29,483 $69,031 $5,170
216,296
kWh
$1,650
-
kW-mo/yr
$(-2,052.0)
-
MMBtu
$19,550
-
gal
$5,165
-
lb
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs