Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

313

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0520 #07 Y:2002 Reduce the pressure of compressed air to the minimum required $45 -
MA0520 #06 Y:2002 Turn off equipment when not in use $106 -
MA0520 #05 Y:2002 Make a practice of turning off lights when not needed $796 $800
MA0520 #04 Y:2002 Utilize higher efficiency lamps and/or ballasts $627 $4,496
MA0520 #03 Y:2002 Reduce space conditioning during non-working hours $1,389 $500
MA0520 #02 Y:2002 Utilize outside air instead of conditioned air for drying $2,161 $2,000
MA0520 #01 Y:2002 Reschedule plant operations or reduce load to avoid peaks $2,609 -
MA0491 #06 Y:2001 Install compressor air intakes in coolest locations $380 $600
MA0491 #05 Y:2001 Install occupancy sensors $410 $85
MA0491 #04 Y:2001 Install / repair insulation on steam lines $500 $150
MA0491 #03 Y:2001 Install compressor air intakes in coolest locations $800 $100
MA0491 #02 Y:2001 Cover open tanks $2,300 -
MA0491 #01 Y:2001 Use evaporation to concentrate material $20,600 $10,000
MA0489 #06 Y:2001 Reduce space conditioning during non-working hours $170 $120
MA0489 #05 Y:2001 Install compressor air intakes in coolest locations $870 $1,000
MA0489 #04 Y:2001 Make a practice of turning off lights when not needed $2,700 $2,000
MA0489 #03 Y:2001 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,700 $180
MA0489 #02 Y:2001 Recover and reuse waste material $54,000 $40,000
MA0489 #01 Y:2001 Recover waste heat from equipment $113,500 $270,000
MA0490 #07 Y:2001 Reduce space conditioning during non-working hours $1,000 -