Assessment Year | 2001 |
---|---|
Principal Product | Structural fasteners |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
83,000
ft2
|
Annual Production | 25,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $244,382 | 5,820,400 |
kWh
|
$0.042 |
Electricity Demand | $165,105 | 10,985 |
kW-mo/yr
|
$15.03 |
Electricity Fees | $19,140 | - |
|
- |
Natural Gas | $189,118 | 29,963 |
MMBtu
|
$6.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,198 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,848 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7311: Ventilation system to shut off when room is not in use | $7,248 | - | - | - |
$7,248
-
MMBtu
|
- | |
02 | 2.2437: Recover waste heat from equipment | $6,500 | $14,500 | - | - |
$6,500
-
MMBtu
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $3,500 | $390 |
$2,300
54,600
kWh
|
$1,200
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,350 | $5,000 |
$2,350
62,000
kWh
|
- | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,500 | $6,000 | - | - | - |
$1,500
-
Tgal
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $1,100 | $1,000 |
$1,100
26,500
kWh
|
- | - | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $1,000 | - | - | - |
$1,000
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $23,198 | $26,890 |
$5,750
143,100
kWh
|
$1,200
-
kW-mo/yr
|
$14,748
-
MMBtu
|
$1,500
-
Tgal
|
||
TOTAL IMPLEMENTED | $12,848 | $1,390 |
$3,400
81,100
kWh
|
$1,200
-
kW-mo/yr
|
$8,248
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs