ITAC Assessment: MA0489
ITAC logo
ITAC Assessment: MA0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Technical Ceramics
NAICS
n/a
SIC 3264: Porcelain Electrical Supplies
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 300,000
lb
Production Hrs. Annual 4,335
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,995 1,674,300
kWh
Electricity Demand $66,639 4,534
kW-mo/yr
Electricity Fees $4,559 -
Natural Gas $145,762 27,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $180,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
01 2.2437: Recover waste heat from equipment $113,500 $270,000 n/a - $113,500
-
MMBtu
-
02 3.5311: Recover and reuse waste material $54,000 $40,000 n/a - - $54,000
-
lb
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,700 $180 $9,700
161,700
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $2,700 $2,000 $2,700
45,900
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $870 $1,000 $870
14,500
kWh
- -
06 2.7224: Reduce space conditioning during non-working hours $170 $120 - $170
-
MMBtu
-
TOTAL RECOMMENDED $180,940 $313,300 $13,270
222,100
kWh
$113,670
-
MMBtu
$54,000
-
lb
TOTAL IMPLEMENTED $9,700 $180 $9,700
161,700
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs