ITAC Assessment: IP0212
ITAC logo
ITAC Assessment: IP0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fasteners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $50
M
to 100
M
# of Employees 99
Plant Area 200,000
ft2
Annual Production 15,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $392,344 9,813,600
kWh
Electricity Demand $650,510 35,866
kW-mo/yr
Electricity Fees $96,632 -
Natural Gas $401,622 149,121
MMBtu
Waste Disposal Costs
Water Usage $46,341 11,564
Tgal
Water Disposal $75,484 11,564
Tgal
TOTAL YEARLY COSTS $1,662,933
RECOMMENDED SAVINGS* $76,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.6211: Conserve energy by efficient use of vending machines $1,010 - $622
15,558
kWh
$388
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $35,687 $360 $2,662
66,561
kWh
- $33,025
-
MMBtu
-
03 2.7135: Install occupancy sensors $914 $593 $914
22,838
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $29,292 $84,000 $15,360
384,000
kWh
$13,932
-
kW-mo/yr
- -
05 2.2135: Repair and eliminate steam leaks $9,826 $39,500 $8,928
223,200
kWh
- - $898
-
Tgal
TOTAL RECOMMENDED $76,729 $124,453 $28,486
712,157
kWh
$14,320
-
kW-mo/yr
$33,025
-
MMBtu
$898
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs